SUNGO-Logo

SUNGO Energy Technology RSDi-2 2-in-1 Rapid Shutdown Devices Data Gateway

SUNGO-Energy-Technology-RSDi-2-2-in-1-Rapid-Shutdown-Devices-Data-Gateway-Product

Litlhaloso

  • Product Name: 2-in-1 Rapid Shutdown Devices SUNGO RSDi-2 &
    Data Gateway SUNGO GTC
  • Rapid Shutdown Devices Model: SUNGO RSDi-2
  • Data Gateway Model: SUNGO GTC
  • Tshebetso Voltage: AC90-264V
  • Maximum RSDi-2 Units per GTC: 50
  • GTC Waterproof Rating: IP67

Sehlahisoa se Felletseview

The SUNGO RSDi-2 is a rapid shutdown device with data monitoring capabilities that works in conjunction with the SUNGO GTC data gateway. It provides module-level rapid shutdown functionality and monitors the operating parameters of PV modules. Document version: SUNGO-RSDi-2&GTCIM-V1-2024 EN Release Date: 2024.7

Sehlahisoa se Felletseview

2-in-l Rapid Shutdown Devices SUNGO RSDi-2SUNGO-Energy-Technology-RSDi-2-2-in-1-Rapid-Shutdown-Devices-Data-Gateway-Fig- (1)

Data Gateway SUNGO GTCSUNGO-Energy-Technology-RSDi-2-2-in-1-Rapid-Shutdown-Devices-Data-Gateway-Fig- (2)

The SUNGO RSDi-2 is a rapid shutdown with data monitoring, matching the data gateway GTC, with a module-level rapid shutdown function that monitors the operating parameters of the PV modules and reports the operating status of the PV modules.

SUNGO-Energy-Technology-RSDi-2-2-in-1-Rapid-Shutdown-Devices-Data-Gateway-Fig- (3)

Setšoantšo sa Khokahano

SUNGO RSDi-2 Product Installation

  • Install the RSDi-2 by snapping the RSDi-2 upward onto the PV module frameSUNGO-Energy-Technology-RSDi-2-2-in-1-Rapid-Shutdown-Devices-Data-Gateway-Fig- (4)
  • Connect IN+ and IN- of RSDi-2 to the positive and negative terminals of the first and second PV module junction boxes respectively, and so on.SUNGO-Energy-Technology-RSDi-2-2-in-1-Rapid-Shutdown-Devices-Data-Gateway-Fig- (5)
  • Connect two adjacent RSDi-2 output ports in series and then connect them near to the inverters with a homemade DC extension cable.SUNGO-Energy-Technology-RSDi-2-2-in-1-Rapid-Shutdown-Devices-Data-Gateway-Fig- (31)

SUNGO GTC Installation

  • Step 1. Data gateway connectivity
    • Install the GTC near the inverter.
    • Connect the OUT+ of the last rapid shutdown to the PV+ of the inverter.
    • Connect the OUT- of the first rapid shutdown through the magnetic ring of the GTC to the PV- of the inverter.
    • After confirming that the connection is correct GTC connects the MCB and then connects it to the AC.

SUNGO-Energy-Technology-RSDi-2-2-in-1-Rapid-Shutdown-Devices-Data-Gateway-Fig- (6)The GTC itself is IP67 waterproof and can be used without a distribution cabinet.
Mohala oa ho kenya letsoho oa AC o hokahane le matla a AC o sebelisa sehokelo se sa keneleng metsi sa L16-2.

  • Etsa bonnete ba hore li-mounts tsa sebopeho li bolokehile le hore li-screw tsohle li tiisitsoe.
  • Check that all cables are connected with the correct polarity and that the connections are firm and reliable to ensure that there are no short circuits.
  • Confirm that the system is connected correctly, the inverter DC switch is ON, and the inverter is turned on.

Hlokomela: one GTC can take up to 50 RSDi-2.

  • Mohato oa 2.
    • Connecting the data gateway to a power source Connect the data gateway to 90-264V AC power supply. Ensure that the power indicator green light is always on, and the running indicator green light is also always on. Check whether the inverter is working normally.
  • Step 3. GTC status indication

SUNGO-Energy-Technology-RSDi-2-2-in-1-Rapid-Shutdown-Devices-Data-Gateway-Fig- (7)

Hlokomela: Boemo ba sesupo bo bontša

SUNGO-Energy-Technology-RSDi-2-2-in-1-Rapid-Shutdown-Devices-Data-Gateway-Fig- (8)

  • Step 4. GTC Entry Rapid Shutdown Device
    • The GTC needs to enter the address of the rapid shutdown devices it manages, otherwise it can’t communicate and upload the rapid shutdown device’s data normally. There are two ways to enter rapid shutdown devices: automatic and manual. When there is only one GTC in the field, you can use the automatic, but if there are more than one GTC in the field, you must execute the manual.

Auto Entry Rapid Shutdown Device (GTC=I pcs)
Press the middle button of GTC to let the Running light always on, let the RSD light go out, after 5 seconds and then long press the button, GTC enters into the automatic recording mode, release the button, the indicator light 234 flashesback and forth waiting for about 10 minutes the Running indicator light flashes to indicate the success of the automatic recording, press the button again to the Running indicator light is always on, the rapid shutdown device is working normally. If the indicator light 3 blinking means that this automatic recording failed please check the line and re-execute the step, if three times are not suc- cessful please contact the relevant technical personnel.

Manual Entry Rapid Shutdown Device (GTC>I pcs)

Hlokomela: If the automatic entry function is used, it will cause conflicts by duplicating the respective managed rapid shutdown devices in multiple GTCs in the field, axi you cnty need to re-execute the qæration of rnanually . (Manual entry of rapid shutdown devices is for recording the field rapid shutdown devices into different GTCs)

Tshebetso
Mokhoa oa kopo o khothalelitsoeng:

  1. First power up the GTC.
  2. Use the USB to RS485 cable to connect GTC and the computer
  3. Khetha serial port e lumellanang
  4. Read MAC Addr and Version, if normal display, represents the current connection is normal, otherwise check whether the cable is properly connected.
  5. Enter the RSDi-2 code into the List list, and then click Write to write it to GTC; there are two ways to enter the code as follows
    1. Through Import button, recognize the selected picture to import.
    2. Kenya nomoro ka bowena ka keyboard, mme o hlokomele hore nomoro ka nngwe e arotswe ke phegelwana.
  6. Monitor the current status of the rapid shutdown through To Monitor.

Wiring

  • Use USB to RS485 to connect the GTC to thecom ter, the connection is shown below:

SUNGO-Energy-Technology-RSDi-2-2-in-1-Rapid-Shutdown-Devices-Data-Gateway-Fig- (9)

Tlhaloso

  • Khetha serial port e lumellanang
  • SUNGO-Energy-Technology-RSDi-2-2-in-1-Rapid-Shutdown-Devices-Data-Gateway-Fig- (10) After success, the green circle is as followsSUNGO-Energy-Technology-RSDi-2-2-in-1-Rapid-Shutdown-Devices-Data-Gateway-Fig- (11)
  • Description of GTC functionsSUNGO-Energy-Technology-RSDi-2-2-in-1-Rapid-Shutdown-Devices-Data-Gateway-Fig- (12)
  1. OMAC Addr
    • Click Read to read the address of GTC, and click Write to write the address in the left input box to GTC.
  2. Phetolelo
    • Click Read to read the software version number of GTC.
  3. DateTime
    • Click Read to read the time of GTC, and click Write to write the system time into GTC.
  4. RSDi-2 Config – Import
    • Click Import to import the RSDi-2 code through the image, as follows
    • Tobetsa Import ho kenya likhoutu tse tsebahalang ka har'a Lebokose la Lenane.SUNGO-Energy-Technology-RSDi-2-2-in-1-Rapid-Shutdown-Devices-Data-Gateway-Fig- (13) SUNGO-Energy-Technology-RSDi-2-2-in-1-Rapid-Shutdown-Devices-Data-Gateway-Fig- (14)
  5. RSDi-2 Config – Read
    • Click Read to read the RSDi-2 list of the current GTC configuration.
  6. RSDi-2 Config – Write
    • Click Write to write the RSDi-2 list to GTC.
  7. RSDi-2 Config – Clear
    • Click Clear to delete all the RSDi-2 in GTC.
  8. RSDi-2 Config – To Monitor
    • Click Monitor to display the RSDi-2 in List on the Monitor page.

Read single RSDi-2 working parameters function description

SUNGO-Energy-Technology-RSDi-2-2-in-1-Rapid-Shutdown-Devices-Data-Gateway-Fig- (15)

Input the RSDi-2 number you need to read, click Read to read its current status.

  • Comm: communication status, Online stands for online, Offline stands for offline.
  • State: current state, ON working, OFF closed.
  • Temp: current temperature, Celsius degrees
  • Error: current fault, Normal stands for normal.
  • KA Moqtage: input voltage
  • Tsoang Voltage:Output Voltage
  • Out Current: Output Current
  • Out Power:Output Power
  • SKU: Product Model
  • Run Time:Run Time
  • On Time: Working Time
  • Engery: Power Generation
  • Recv Time: Receive Time

Lekola Tlhaloso ea Mosebetsi

SUNGO-Energy-Technology-RSDi-2-2-in-1-Rapid-Shutdown-Devices-Data-Gateway-Fig- (16)

Click Start to start monitoring, the software will refresh the status of RSDi-2 in List regularly.

GTC distribution network (APP2.0 instructions for use)

  • Step 1. Download APP and register account

SUNGO-Energy-Technology-RSDi-2-2-in-1-Rapid-Shutdown-Devices-Data-Gateway-Fig- (17) SUNGO-Energy-Technology-RSDi-2-2-in-1-Rapid-Shutdown-Devices-Data-Gateway-Fig- (18)Skena khoutu ea QR ho khoasolla APP SUNGO-Energy-Technology-RSDi-2-2-in-1-Rapid-Shutdown-Devices-Data-Gateway-Fig- (19)Bula APP ho ngolisa akhaonto

  • Step 2. Creation of PV power plants

SUNGO-Energy-Technology-RSDi-2-2-in-1-Rapid-Shutdown-Devices-Data-Gateway-Fig- (20)Tobetsa ho theha seteishene sa motlakase

  • Step 3. Filling in power plant information

SUNGO-Energy-Technology-RSDi-2-2-in-1-Rapid-Shutdown-Devices-Data-Gateway-Fig- (21)Just fill in the information according to your own power station

  • Step 4. Scanning the data collection gateway

SUNGO-Energy-Technology-RSDi-2-2-in-1-Rapid-Shutdown-Devices-Data-Gateway-Fig- (22)Click the drop-down menu in the upper right corner, click “Add Logger”, and scan the QR code of the WIFI serial number on the left side face of the Data Gateway GTC SUNGO-Energy-Technology-RSDi-2-2-in-1-Rapid-Shutdown-Devices-Data-Gateway-Fig- (23)

  • Step 5. GTC WIFI distribution network

SUNGO-Energy-Technology-RSDi-2-2-in-1-Rapid-Shutdown-Devices-Data-Gateway-Fig- (24)Taba ea pele, tobetsa ho menu e theoha k'honeng e kaholimo ho le letona la "Overview” page, and then click on “Configuring Network”. Operate according to the indicated process. It will be okay as long as the successful network configuration is displayed

  • Step 6. Optimizer(RSD) Details
  1. SUNGO-Energy-Technology-RSDi-2-2-in-1-Rapid-Shutdown-Devices-Data-Gateway-Fig- (25)Click on the drop-down menu in the upper right corner on the “Overview” page, and then click on “Device List”
  2. Tobetsa ho "Logger" kholomo ho kenya leqephe la lintlha tsa mokelli
  3. Tobetsa ho "Optimizer Controller" tlasa "Logger Details" ho kenya leqephe la "Optimizer Gateway Detail"
  4. Click on “Sub Devices” and you can see the optimizer serial number
  5. Click on the arrow on the right side of the optimizer serial number to enter the “Optimizer Detail(RSD Detail)” page
  6. The device information will be displayed on the “Optimizer Detail(RSD Detail)” pageSUNGO-Energy-Technology-RSDi-2-2-in-1-Rapid-Shutdown-Devices-Data-Gateway-Fig- (26)
  7. Tobetsa aekhoneng ea "Histori" ka tlase ho view the graphical display of the “Optimizer Detail(RSD Detail)” (showing input voltage, tlhahiso voltage, temperature, output current and output power)
  • Step 7. Observation of the status of the power station

SUNGO-Energy-Technology-RSDi-2-2-in-1-Rapid-Shutdown-Devices-Data-Gateway-Fig- (27)

  1. Khutlela ho "Overview” page and you can see the basic information about the power generation of the power station
  2. Tobetsa ho "Histori" ka lehlakoreng le letona la "Overview” in the APP and you can see the peak power of the power station
  3. Click on “Layout” on the right side of “History” in the APP and you can see the status of the photovoltaic modules
  4. Click on “Display Curves” and you can see the power curve of the modules
  5. Tobetsa nako e telele ho "Photovoltaic Module Graph" 'me lintlha tse qaqileng tsa li-module li tla hlahisoa.
  • Step 8: Layout modifications

SUNGO-Energy-Technology-RSDi-2-2-in-1-Rapid-Shutdown-Devices-Data-Gateway-Fig- (28)

    • Tobetsa aekhoneng e nyane mona ho fetola sebopeho
    • Tobetsa aekhoneng e nyane mona. Ho tla ba le marang-rang a matheba ho tsamaisa moralo
    • Tobetsa ho "Edit"
    • You can modify the angle of the components. Save it after the modification is completed
  • Mesebetsi e meng

SUNGO-Energy-Technology-RSDi-2-2-in-1-Rapid-Shutdown-Devices-Data-Gateway-Fig- (29)

    • Add visitor’s email address
    • Switch perspectives, that of professional consultants and end users All the above steps are operated based on end users

Ntlo-khōlō ea Lefatše
SUNGO Energy Technology (Jiangsu) Co., Ltd. Add: 3rd Floor, Building 9-1, Start-up Zone of Yangtze River Delta International R&D Community, No. 286 Qinglonggang Road, High-speed Railway New Town, Xiangcheng District, Suzhou City, Jiangsu Province, China

Europe Ntlo-kholo
SUNGO Energy Technology B.V. Add: Hoofdweg-Noord 9T, 2913LB Nieuwerkerk aan den IJssel, The Netherlands

Motheo oa Tlhahiso ea Optimizer&Energy Storage
KONKA&SUNGO Smart Energy (Zhejiang) Co., Ltd. Add: Building 3#, Small and Micro Industrial Park, No. 69 Xingmei Avenue, Chengtan Street, Xinchang County, Shaoxing City, Zhejiang Province, China

Sungo Energy UK
Eketsa: 60 Windsor Avenue, London SW19 2RR, United Kingdom

Sungo Energy DE
SUNGO Energietechnik GmbH
Add: Berliner Str. 300b, 63065 Offenbach am Main, Germany

Sungo Energy USA
SUNGO ENERGY TECHNOLOGY INC.
Add: 5900 Balcones Drive,STE 100 Austin TX 78731

Web: www.sungoess.com
E-mail: sales@sungoess.com
Global Headquarters Tel:+86 (O) 512 6512 2036
Europe Headquarters Tel:+31 (0)10 307 21 68
SUNGO Energy I-JK Tel:+44 @) 330 122 6559
E-mail ka mor'a thekiso: after-sales@sungoess.com

Sungo reserves all rights. All other trademarks mentioned in this document are trademarks of their respective owners. The information in this document is for reference only and does not constitute any offer or commitment. Sungo may modify the above information without prior notice.

SUNGO-Energy-Technology-RSDi-2-2-in-1-Rapid-Shutdown-Devices-Data-Gateway-Fig- (30)

FAQs

What is the maximum number of RSDi-2 units that can be connected to one GTC?

One GTC can accommodate up to 50 RSDi-2 units.

Litokomane / Lisebelisoa

SUNGO Energy Technology RSDi-2 2-in-1 Rapid Shutdown Devices Data Gateway [pdf] Tlhophiso Tataiso
RSDi-2, GTC, RSDi-2 2-in-1 Rapid Shutdown Devices Data Gateway, RSDi-2, 2-in-1 Rapid Shutdown Devices Data Gateway, Shutdown Devices Data Gateway, Devices Data Gateway, Data Gateway, Gateway

Litšupiso

Tlohela maikutlo

Aterese ea hau ea lengolo-tsoibila e ke ke ea phatlalatsoa. Libaka tse hlokahalang li tšoailoe *